Skip to content

Industrial software

Production scheduling software that replaces the planning spreadsheet

Finite-capacity planning on a drag-and-drop Gantt, with real machine calendars, setup times, material checks and what-if scenarios for rush orders.

We build a production scheduler around your work centres, your routings and the rules your planner already applies in their head. It starts from a scheduling base we have already built and tested (capacity model, Gantt board, sequencing rules, ERP import), then we adapt constraints, calendars and screens to your shop. The planner keeps control; the software does the arithmetic and shows the consequences.

Starting price
From €4,990 excl. VAT
First release
6-10 weeks

Built to measure for job shops and make-to-order manufacturers, starting from a proven base we have already developed and tested.

Production scheduling software that replaces the planning spreadsheet

The problem

Why the plan is out of date by Tuesday

In many job shops and make-to-order plants, the production plan lives in an Excel file that one planner maintains. It holds dozens of orders, colour codes only that person fully understands, and formulas that break when a row is inserted. The ERP knows the orders and routings, but its planning works with infinite capacity, so every machine looks available whatever is already loaded.

Then reality arrives: a rush order from a key customer, a machine down for two days, a material delivery that slips. Re-planning means hours of moving rows and phoning the floor, and the printed plan on the board is outdated before the end of the shift.

  • Delivery dates are promised without seeing the real load on the bottleneck machine.
  • Setup times are ignored in the plan, so the sequence on the floor differs from the one in the office.
  • Orders are released before material is available, and half-started jobs block the machines.
  • Nobody can answer quickly what happens to other orders if a rush job is squeezed in.
  • The plan depends on one person, and holidays or sick leave freeze the whole process.

The solution

A shared, finite-capacity plan the planner can actually change

Production orders and their routings come from your ERP. Each operation is placed on a work centre with its own calendar of shifts, holidays and maintenance, and with the operators qualified to run it. The scheduler respects capacity, setup times and precedence between operations, then shows the result on a Gantt chart the planner can adjust by drag and drop.

Before committing a change, the planner can open a what-if copy: insert the rush order, move a job to another machine, add a Saturday shift, and compare delivery dates side by side. The chosen plan is published to screens on the shop floor, and progress reported by operators feeds back into the next update.

Built to measure for job shops and make-to-order manufacturers, starting from a proven base we have already developed and tested.

First release in 6-10 weeks · From €4,990 excl. VAT

Features

What the software does

Orders and capacity

  • ERP order and routing import

    Production orders, operations, standard times and due dates read from your ERP, refreshed on a schedule or on demand, with a clear list of orders that are missing data.

  • Work centre and operator calendars

    Shift patterns, holidays, planned maintenance and operator skills per work centre, so capacity is the real available time and not a theoretical eight hours.

  • Material availability check

    Each order is checked against stock and open purchase orders for its components; orders without material are flagged before they are released to the floor.

Scheduling board

  • Drag-and-drop Gantt

    Operations per machine on a timeline, colour-coded by customer, status or due-date risk; moving one operation shifts dependent ones and shows the knock-on effects immediately.

  • Setup-aware sequencing

    Rules for setup times between product families, materials, colours or tools, so the scheduler groups similar jobs and the plan reflects real changeovers.

  • Bottleneck and load view

    Load against capacity per work centre and week, highlighting overloaded machines and idle capacity that could absorb new orders.

What-if and shop floor

  • What-if scenarios

    Copy the current plan, insert a rush order or simulate a breakdown, and compare delivery dates and lateness across scenarios before choosing one.

  • Published schedule on screens

    Each work centre sees its job list in order on a shop-floor screen or tablet, with drawings or work instructions linked where available.

  • Progress feedback

    Operators report start, stop and quantities per operation, or machine data does it automatically, so the plan updates from what actually happened.

In practice

How it works day to day

  1. 1

    Import

    New and changed production orders arrive from the ERP with routings, quantities and due dates.

  2. 2

    Check

    The scheduler verifies material availability and missing data, and proposes a first finite-capacity sequence.

  3. 3

    Plan

    The planner reviews the Gantt, adjusts priorities and sequences by drag and drop, and runs what-if scenarios for urgent requests.

  4. 4

    Publish

    The agreed plan is published; work centres see their job lists and sales sees realistic delivery dates.

  5. 5

    Feedback and re-plan

    Progress from the floor updates the plan, delays become visible early, and the planner re-plans with current information.

Integrations

Connects with the tools you already use

  • ERP

    Orders, routings, stock and purchase orders from SAP Business One, Microsoft Dynamics 365 Business Central, Odoo or Sage, via API, database views or scheduled exports.

  • Machine data and monitoring

    Actual start, stop and counts from a machine data layer or monitoring system, to replace or complement manual feedback.

  • CAD and document storage

    Links to drawings and work instructions stored in your file server, SharePoint or PDM, shown on the shop-floor job list.

  • Excel import and export

    One-time import of the current planning file and exports of the plan for customers or management who still want a spreadsheet.

Integrations depend on the APIs or exports your current tools provide. We verify them during analysis.

Technical sheet

Technical specifications

Application type
Web application for planners and managers, with tablet and TV views for work centres on the shop floor
Indicative stack
TypeScript and React with a Gantt component, Node.js or Python scheduling service, PostgreSQL (indicative, adapted to your constraints)
Hosting
EU cloud hosting or a server in your plant; works over the internal network for shop-floor screens
User roles
Planner, production manager, shift leader, operator, sales (read-only delivery dates), administrator
Languages
Interface in one or more languages, including separate languages for office and shop-floor screens
Data and privacy
Planning data is business data; operator assignments and skills are personal data handled under GDPR with role-based access and EU hosting by default
Security
Individual logins, change history on the plan with who moved what, encrypted connections and daily backups
First release
First release in 6-10 weeks

Who it is for

  • Job shops and subcontract machining companies with many short, varied orders
  • Make-to-order manufacturers whose ERP plans with infinite capacity
  • Plants with a clear bottleneck machine or line where sequence matters
  • Companies where production planning depends on one spreadsheet and one person

Use cases

Answering a rush request in minutes

A customer asks for 200 parts next week. The planner builds a what-if scenario, sees which three orders would slip and by how much, and calls sales back with a fact-based answer.

Grouping jobs to cut changeovers

On a press line with long tool changes, the scheduler groups orders by tool and material within their due dates, and the floor follows the same sequence as the office.

Planning without the planner in the building

During the planner's holiday, the shift leader opens the same board, sees the agreed sequence and the rules behind it, and handles small changes without guessing.

The project

How the project runs

  1. 1

    Analysis

    A working session on your current process, data and tools. You receive a written scope, milestones and a fixed quote.

  2. 2

    First release

    We adapt the proven base to your workflow and deliver a first version your team can use on real data.

  3. 3

    Iterations

    Short feedback cycles with the people who use the software, with clear acceptance checks for each milestone.

  4. 4

    Go-live

    Data import, training and production release, with the team that built the software on hand.

  5. 5

    Support

    Fixes and adjustments in the first weeks, then optional ongoing support or new features as separate, scoped iterations.

Included in the first release

  • Analysis of work centres, routings, calendars and your current planning rules
  • ERP import of orders, routings and material data
  • Finite-capacity scheduler with setup rules and drag-and-drop Gantt
  • What-if scenarios and load views
  • Shop-floor job lists and progress feedback
  • Import of the current planning file, training and support in the first weeks

Not included

  • Full mathematical optimisation of every constraint, which most job shops do not need for a first release
  • MRP and purchasing, which stay in your ERP
  • Hardware such as shop-floor screens and tablets

Price

Transparent starting price

From €4,990 excl. VAT

First release in 6-10 weeks

Starting price excl. VAT for a first production release. The final price depends on your specifications (integrations, modules, sites, users) and is confirmed in writing before work starts.

We work to agreed milestones and acceptance checks. If we miss a committed delivery, we correct the work on our side until it meets what we agreed.

Request a quote

Frequently asked questions

Is this an off-the-shelf APS system?

No. It is scheduling software built for your shop, starting from a base we have already developed and tested: the capacity model, Gantt board, sequencing rules and ERP connectors. We adapt constraints, calendars, setup rules and screens to how your planner works. You get a tool that matches your shop instead of a large APS that needs months of configuration.

What is included in the price from €4,990?

A first production release with ERP import, work centre calendars, finite-capacity scheduling with setup rules, the Gantt board, what-if scenarios and shop-floor job lists, with training. The final price depends on the number of work centres, the complexity of constraints and the integrations. Scope and price are fixed in writing before we start. Excl. VAT.

Does the software decide the plan automatically?

It proposes a sequence that respects capacity, setups and due dates, and the planner decides. Every automatic proposal can be changed by hand, and the board shows the consequences of each change. Planners usually keep the final say, and that is how we design it.

Can we start from our current Excel plan?

Yes. We analyse the spreadsheet to understand the rules hidden in it, import open orders and settings where useful, and run both in parallel for a short period so the planner can compare.

Which ERP systems can it work with?

Any ERP that exposes orders and routings through an API, database views or a reliable export. We check this in the analysis. Writing back planned dates to the ERP is possible where the ERP allows it.

What if our routings and standard times in the ERP are not accurate?

This is common. The first weeks of the project often include cleaning the most used routings. With progress feedback or machine data, the system can also compare planned and actual times, so standards improve over time.

Industrial software

Production monitoring and OEE dashboard

Live machine states, OEE per machine and shift, operator downtime reasons, andon screens and automatic shift reports for SME factories.

From €4,990excl. VAT6-9 weeks
Industrial software

Machine data collection and connectivity

The connectivity layer between your machines and your software: edge gateways, protocol connectors, buffering, time-series storage and data contracts.

From €4,990excl. VAT6-10 weeks
Industrial software

Lot and serial traceability software

Lot and serial tracking from goods receipt to dispatch, with barcode labels, batch genealogy, recall simulation and quality data on every lot.

From €4,990excl. VAT6-9 weeks

Request a quote for this service

A few lines are enough. We reply within one business day with questions and a first view of scope and cost.

From €4,990 excl. VAT · First release in 6-10 weeks

Service: Production scheduling software

We use your details only to reply to this request. See our Privacy Policy.

Want to see if it fits your job shops and make-to-order manufacturers?

Tell us how you work today and which tools you use. We reply with a concrete first release proposal, a timeline and a price.