Answering a rush request in minutes
A customer asks for 200 parts next week. The planner builds a what-if scenario, sees which three orders would slip and by how much, and calls sales back with a fact-based answer.
Industrial software· Job shops and make-to-order manufacturers
Finite-capacity planning on a drag-and-drop Gantt, with real machine calendars, setup times, material checks and what-if scenarios for rush orders.
We build a production scheduler around your work centres, your routings and the rules your planner already applies in their head. It starts from a scheduling base we have already built and tested (capacity model, Gantt board, sequencing rules, ERP import), then we adapt constraints, calendars and screens to your shop. The planner keeps control; the software does the arithmetic and shows the consequences.
Built to measure for job shops and make-to-order manufacturers, starting from a proven base we have already developed and tested.

The problem
In many job shops and make-to-order plants, the production plan lives in an Excel file that one planner maintains. It holds dozens of orders, colour codes only that person fully understands, and formulas that break when a row is inserted. The ERP knows the orders and routings, but its planning works with infinite capacity, so every machine looks available whatever is already loaded.
Then reality arrives: a rush order from a key customer, a machine down for two days, a material delivery that slips. Re-planning means hours of moving rows and phoning the floor, and the printed plan on the board is outdated before the end of the shift.
The solution
Production orders and their routings come from your ERP. Each operation is placed on a work centre with its own calendar of shifts, holidays and maintenance, and with the operators qualified to run it. The scheduler respects capacity, setup times and precedence between operations, then shows the result on a Gantt chart the planner can adjust by drag and drop.
Before committing a change, the planner can open a what-if copy: insert the rush order, move a job to another machine, add a Saturday shift, and compare delivery dates side by side. The chosen plan is published to screens on the shop floor, and progress reported by operators feeds back into the next update.
Built to measure for job shops and make-to-order manufacturers, starting from a proven base we have already developed and tested.
First release in 6-10 weeks · From €4,990 excl. VAT
Features
Production orders, operations, standard times and due dates read from your ERP, refreshed on a schedule or on demand, with a clear list of orders that are missing data.
Shift patterns, holidays, planned maintenance and operator skills per work centre, so capacity is the real available time and not a theoretical eight hours.
Each order is checked against stock and open purchase orders for its components; orders without material are flagged before they are released to the floor.
Operations per machine on a timeline, colour-coded by customer, status or due-date risk; moving one operation shifts dependent ones and shows the knock-on effects immediately.
Rules for setup times between product families, materials, colours or tools, so the scheduler groups similar jobs and the plan reflects real changeovers.
Load against capacity per work centre and week, highlighting overloaded machines and idle capacity that could absorb new orders.
Copy the current plan, insert a rush order or simulate a breakdown, and compare delivery dates and lateness across scenarios before choosing one.
Each work centre sees its job list in order on a shop-floor screen or tablet, with drawings or work instructions linked where available.
Operators report start, stop and quantities per operation, or machine data does it automatically, so the plan updates from what actually happened.
In practice
New and changed production orders arrive from the ERP with routings, quantities and due dates.
The scheduler verifies material availability and missing data, and proposes a first finite-capacity sequence.
The planner reviews the Gantt, adjusts priorities and sequences by drag and drop, and runs what-if scenarios for urgent requests.
The agreed plan is published; work centres see their job lists and sales sees realistic delivery dates.
Progress from the floor updates the plan, delays become visible early, and the planner re-plans with current information.
Integrations
Orders, routings, stock and purchase orders from SAP Business One, Microsoft Dynamics 365 Business Central, Odoo or Sage, via API, database views or scheduled exports.
Actual start, stop and counts from a machine data layer or monitoring system, to replace or complement manual feedback.
Links to drawings and work instructions stored in your file server, SharePoint or PDM, shown on the shop-floor job list.
One-time import of the current planning file and exports of the plan for customers or management who still want a spreadsheet.
Integrations depend on the APIs or exports your current tools provide. We verify them during analysis.
Technical sheet
A customer asks for 200 parts next week. The planner builds a what-if scenario, sees which three orders would slip and by how much, and calls sales back with a fact-based answer.
On a press line with long tool changes, the scheduler groups orders by tool and material within their due dates, and the floor follows the same sequence as the office.
During the planner's holiday, the shift leader opens the same board, sees the agreed sequence and the rules behind it, and handles small changes without guessing.
The project
A working session on your current process, data and tools. You receive a written scope, milestones and a fixed quote.
We adapt the proven base to your workflow and deliver a first version your team can use on real data.
Short feedback cycles with the people who use the software, with clear acceptance checks for each milestone.
Data import, training and production release, with the team that built the software on hand.
Fixes and adjustments in the first weeks, then optional ongoing support or new features as separate, scoped iterations.
Price
From €4,990 excl. VAT
First release in 6-10 weeks
Starting price excl. VAT for a first production release. The final price depends on your specifications (integrations, modules, sites, users) and is confirmed in writing before work starts.
We work to agreed milestones and acceptance checks. If we miss a committed delivery, we correct the work on our side until it meets what we agreed.
Request a quoteNo. It is scheduling software built for your shop, starting from a base we have already developed and tested: the capacity model, Gantt board, sequencing rules and ERP connectors. We adapt constraints, calendars, setup rules and screens to how your planner works. You get a tool that matches your shop instead of a large APS that needs months of configuration.
A first production release with ERP import, work centre calendars, finite-capacity scheduling with setup rules, the Gantt board, what-if scenarios and shop-floor job lists, with training. The final price depends on the number of work centres, the complexity of constraints and the integrations. Scope and price are fixed in writing before we start. Excl. VAT.
It proposes a sequence that respects capacity, setups and due dates, and the planner decides. Every automatic proposal can be changed by hand, and the board shows the consequences of each change. Planners usually keep the final say, and that is how we design it.
Yes. We analyse the spreadsheet to understand the rules hidden in it, import open orders and settings where useful, and run both in parallel for a short period so the planner can compare.
Any ERP that exposes orders and routings through an API, database views or a reliable export. We check this in the analysis. Writing back planned dates to the ERP is possible where the ERP allows it.
This is common. The first weeks of the project often include cleaning the most used routings. With progress feedback or machine data, the system can also compare planned and actual times, so standards improve over time.
Live machine states, OEE per machine and shift, operator downtime reasons, andon screens and automatic shift reports for SME factories.
The connectivity layer between your machines and your software: edge gateways, protocol connectors, buffering, time-series storage and data contracts.
Lot and serial tracking from goods receipt to dispatch, with barcode labels, batch genealogy, recall simulation and quality data on every lot.
A few lines are enough. We reply within one business day with questions and a first view of scope and cost.
From €4,990 excl. VAT · First release in 6-10 weeks
Tell us how you work today and which tools you use. We reply with a concrete first release proposal, a timeline and a price.